Project update April 2015

Apr 12th, 2015 | By | Category: PROJECT NEWS

Good progress is being made on all fronts. Here is a list of what has been done in the past 3 months and some photos. Make sure you check out our facebook (www.facebook.com/flycaravelle) page which is updated more often:

– The rear cabin wall has been installed
– The original Air France wallpaper has been remanufactured and will be fitted to the backwall giving you the impression of entering a complete Caravelle

-80% of all gauges have been converted for simulator use.

– The 4 RMIs have been sent to the czech DC-9 project and are being interfaced.

– The sim has been fitted with a strong centrifugal fan which blows air through the old ventilation tubes.

– All cabin panels have been repainted

– Seat are being completely refurbished with new upholstery and fabric.

 

10014097_741505835925298_3030814210569517866_o 10271423_791388037603744_5808014240537240478_o 10688256_778921872183694_6298786408200244518_o 10943774_778921958850352_6374265989687746127_o 10955200_791388660937015_4705520182018282383_o 11009903_797167837025764_5370337509966379872_o 11043323_782415085167706_5366495015908908148_o 11110808_791387774270437_7705031578404618710_o(1) 11146361_10204610508406833_7119691962751762869_o 20150228_180410 20150304_112203 20150304_175928 316641427915927551 317041427922746469


 

 

 

 

Leave a Comment